Quality assurance as a role of its own

QA and software testing by our own testers

A defect caught in testing costs a fraction of what the same defect costs in production. We test software, shops and interfaces systematically — as part of our own development projects, or as a standalone service for your in-house team.

  • Testing by our own testers
  • Accessibility audits against the Austrian Accessibility Act and WCAG 2.1 AA
  • Also for software another provider built

This page describes the work that is planned last and cut first in many projects. Where it sits in day-to-day operations is shown on the maintenance and support hub.

What does a QA provider do?

A QA provider tests software, shops and interfaces independently of the developers who built them. That covers the test concept, the test cases, manual and automated execution, and a documented assessment of every finding. The outcome is not defect-free software but a reliable statement of which risks are still open before go-live.

Why testing belongs in its own hands

In most projects the developer tests their own code. That catches typos, but not the cases nobody thought of while building: concurrent access, invalid input, an abandoned checkout, a record full of special characters.

That is why testing here is a role of its own with its own responsibility, rather than a step squeezed into the end of a sprint.

An independent test team pays off when

  • a go-live is due and nobody has tested independently against the requirements

  • your development sits in-house or with another provider

  • the same flows are checked by hand again at every release

  • your website or shop falls under accessibility legislation

What we do

We separate manual testing, where experience and judgement count, from automated testing for everything that recurs at every release.

  • Test concept and strategy

    Which areas are tested how thoroughly, with which methods, in which environment? We prioritise by risk: a checkout is tested differently from a legal notice page.

  • Test management

    We plan, steer and document the testing process — including for projects other providers deliver.

  • Functional testing

    We test systematically against the requirements, with documented test cases and traceable results.

  • Test automation

    Automated regression tests for the flows that have to be verified again after every change: checkout, sign-in, price calculation, interface behaviour.

  • Exploratory testing

    Experienced testers explore the system in a structured way and find the cases that appear in no requirement. In our experience that is exactly where the least pleasant surprises sit.

  • Mobile testing

    We test on real devices, not only in an emulator. For shops where most traffic is mobile, that matters more than anywhere else.

  • Interface and load testing

    How does the system behave under load, on timeouts, with invalid data? For systems connected to an ERP and to marketplaces this is the most critical area — how those connections are built is described under ERP integration, and the channel side under marketplace integration.

  • Usability review

    We assess usability against established criteria and deliver concrete, actionable recommendations.

Accessibility audit against the Austrian Accessibility Act and WCAG 2.1 AA

Since 28 June 2025 the Austrian Accessibility Act (Barrierefreiheitsgesetz, BaFG) has required many websites and online shops selling to consumers to be accessible. Breaches carry penalties of up to €80,000 (as of September 2026). Whether your offering is in scope is something we clarify in the first consultation. We test your website or shop systematically against WCAG 2.1 AA, with documented test cases rather than a surface-level checklist.

Testing is done against the WCAG 2.1 AA success criteria, not by an automated tool alone. A checker finds some of the violations; whether an error message is understandable, or a filter stays operable from the keyboard, is a judgement a person has to make.

What the accessibility audit covers

  • Operation without a mouse, with a visible focus indicator
  • Contrast of text, controls and graphics
  • Alternative text for images and product photography
  • Heading structure and page landmarks
  • Forms: labels, error messages, help text
  • Checkout and sign-in from start to finish
  • Behaviour at high zoom and on small screens
  • Screen reader operation on a real device

You receive a prioritised list of measures: what is legally critical, what can be fixed quickly and what needs a project of its own. Every item names the success criterion it breaches, the pages affected and the route to a fix — usable by your own developers or by us. Once the fixes are in, we retest and document the level reached.

How we work

Four models, depending on who develops and when testing is needed:

How we work
ModelDescriptionSuited to
Project-embeddedQA as a fixed part of our own development projectsclients with Clickservice projects
External QAwe test what another provider buildscompanies with in-house development
Test automationbuilding and maintaining automated test suitessystems with frequent releases
Acceptance supportwe test before you sign offbefore the go-live of a third-party project

Project management sits in Vienna and works in German; test planning and execution are handled by testers from our own team, supported by AI-assisted tooling for test-case derivation and documentation. Your contact stays reachable in Vienna.

Development itself happens in software development, where testing is part of every delivery — including for a piece of custom software, whose roles, permissions and process logic are checked against the requirement. As a standalone service you book it here — including for systems we did not build.

How a testing project runs

  1. System review (free, 30 minutes) — which system, which state, which deadline.
  2. Test concept and risk analysis — which areas are tested how thoroughly, in which environment and with which data.
  3. Test cases and test data — documented cases rather than a list in the tester's head, plus the data that makes realistic defects surface at all.
  4. Execution — manual, exploratory and automated, by area. Every finding is recorded with severity, reproduction steps and a recommendation.
  5. Report and retest — you receive a recommendation on every finding; once fixes are in we retest and document the level reached.

Every finding is written up so a developer can reproduce it without asking a question: severity, affected environment, steps to reproduce, expected and actual behaviour. What you get at the end is not a defect list but a recommendation — release, release with stated limitations, or fix first. That statement is the real product of a test: it moves the go-live decision from a gut feeling onto documented findings.

What drives the effort

The effort of a test depends on scope, the number of interfaces and how much of the testing is to be automated. An accessibility audit follows the page count and the functional scope; we quote the range after a short review, in writing and before you commit. For every other service you receive a quote after the system review. Licence and hosting costs for your test and development environments are not included; we itemise them separately.

Whether building a test automation suite pays off depends on release frequency: from roughly one release a month, the automated regression run saves more manual effort than its upkeep costs. At two releases a year, manual testing is the cheaper answer — and we say so before an automation project starts.

Included in a testing project

  • Risk-based test concept
  • Documented test cases
  • Agreed test data and test environment
  • Findings report with severity and recommendation
  • Retest after the fixes
  • Closing documentation of the level reached

If testing is to run continuously rather than once, it belongs in operations: scope and response times are set out under maintenance and support.

Evidence and references

Our quality assurance can be checked by its records: every test ends with a test report that becomes part of the project documentation. The partner status we hold is listed under partners and certifications.

Figures from testing projects are published only once the client has released them; the projects that have been released are on the case studies page. In the first consultation we show comparable work even where it cannot be named publicly — under NDA if you prefer.

Frequently asked questions

  • Do we need external QA if we have our own developers?

    Often yes. In our experience developers test against their own idea of the system. An independent tester works against the requirement, and against the cases nobody planned for.

  • What drives the effort of a pre-go-live acceptance test?

    The size of the system, the number of interfaces and how many flows have to be tested. For shops with an ERP integration, interface testing accounts for the largest share of the work. We name the effort in a quote after the system review.

  • Is test automation worth it?

    From roughly one release a month onwards, usually yes. Building the suite is a one-off effort; after that every release drops part of the manual effort, and recurring defects surface more reliably.

  • Do you also test software you did not build?

    Yes, and that is a substantial part of this service. We work as an independent test team, including towards your existing provider.

  • What does the Austrian Accessibility Act require of our online shop?

    Shops and websites in scope have had to meet WCAG 2.1 AA since 28 June 2025, and breaches carry penalties of up to €80,000 (as of September 2026). Whether your offering is in scope is something we clarify in the first consultation. Our audit shows where you stand and which measures take priority.

  • How does a testing project run?

    We start with a test concept and risk-based prioritisation, followed by execution and documentation. You receive traceable reports with a recommendation on every finding.

The next step

Bring along which system is to be tested, who built it and when the deadline falls. You do not need a test concept — that is our job. Where quality assurance sits in the bigger picture is shown on the services hub.

Let us talk about your quality assurance

Thirty minutes with someone who tests every day. Afterwards you know which parts of your system carry the greatest risk and what testing them involves.

  • Testing by our own testers
  • A reply within 24 hours on working days
  • NDA before the first conversation if you prefer